Hello members.
 I talked with my contacts at One Call and discussed installing sod where you are not adding soil just raking the existing ground to loosen it up.

You do need locates because depending on how ‎ vigorous you are you may disturb the existing ground any where from half an inch to three inches.

Locates are required where you break the plane of the surface of the ground.